LIST OF I LLU STRATI O N S.
PLATE. FACING.
WiLLiAM H. VANDERBILT. .... Dedication.
1.—The Alexandrian obelisk, " Cleopatra's Needle." Alexandria, Egypt, October, PAGE.
1879. . . . . . . . . 1
II.—Elevation of the obelisk, raised from pedestal, with machinery in position lor
turning. Alexandria. ..... 2
III. —Side elevation. Preparations for releasing machinery. Alexandria. " 2
IV. —Excavations at Alexandria, showing pedestal, steps and position of crabs. 4
V.—The crabs as lound. . . . . . . . " 6
VI.—The staging. November 5, 1879. . . . . . " 8
VII.—The obelisk encased and stayed. The hoisting shears with trunnions suspended
to them.
IO
VIII.—Turning the obelisk. December 6, 18/9.
. "
12
IX.—The obelisk horizontal. December 6, 18/9.
X.—City and port of Alexandria. The overland route proposed.
The water route
14
followed.
16
XI.—Steps and pedestal. Section and plan.
XII.—Preparations for launching. Section through caisson and Obelisk.
Caisson adoat.
18
Alexandria.
20
A.—Lowering and launching the caisson.
«
20
XIII.—Embarking the pedestal. .....
22
XIV.—Embarking the obelisk. . . . . - .
.
24
XV.—Embarking the obelisk. Section and plan.
XVI.—The steamer " Dessoug," with obelisk on board, ready for
departure from
24
Alexandria.
26
XVII.—Disembarking the pedestal. New York.
.
28
XVIII.—Trucking the pedestal. ......
.
30
B.—Laying the corner-stone. .....
XIX.—Obelisk on pontoons entering landing-stage at 96th Street, New
Y ork. Section
32
and plan of disembarking stage.
34
XX.—Disembarking the obelisk. .....
XXI.—Cross section through obelisk and pontoons. Side elevation
.
of obelisk and
36
pontoons.
38
XXII.—Obelisk crossing the Hudson River Railroad.
40
XXIII.—Route of the obelisk in New York.
42
XXIV.—Land transportation. Turning apparatus. Trestle in Central Park. "
44
c.—Iron channels and marine railway. ....
ix
46
PLATE. FACING.
WiLLiAM H. VANDERBILT. .... Dedication.
1.—The Alexandrian obelisk, " Cleopatra's Needle." Alexandria, Egypt, October, PAGE.
1879. . . . . . . . . 1
II.—Elevation of the obelisk, raised from pedestal, with machinery in position lor
turning. Alexandria. ..... 2
III. —Side elevation. Preparations for releasing machinery. Alexandria. " 2
IV. —Excavations at Alexandria, showing pedestal, steps and position of crabs. 4
V.—The crabs as lound. . . . . . . . " 6
VI.—The staging. November 5, 1879. . . . . . " 8
VII.—The obelisk encased and stayed. The hoisting shears with trunnions suspended
to them.
IO
VIII.—Turning the obelisk. December 6, 18/9.
. "
12
IX.—The obelisk horizontal. December 6, 18/9.
X.—City and port of Alexandria. The overland route proposed.
The water route
14
followed.
16
XI.—Steps and pedestal. Section and plan.
XII.—Preparations for launching. Section through caisson and Obelisk.
Caisson adoat.
18
Alexandria.
20
A.—Lowering and launching the caisson.
«
20
XIII.—Embarking the pedestal. .....
22
XIV.—Embarking the obelisk. . . . . - .
.
24
XV.—Embarking the obelisk. Section and plan.
XVI.—The steamer " Dessoug," with obelisk on board, ready for
departure from
24
Alexandria.
26
XVII.—Disembarking the pedestal. New York.
.
28
XVIII.—Trucking the pedestal. ......
.
30
B.—Laying the corner-stone. .....
XIX.—Obelisk on pontoons entering landing-stage at 96th Street, New
Y ork. Section
32
and plan of disembarking stage.
34
XX.—Disembarking the obelisk. .....
XXI.—Cross section through obelisk and pontoons. Side elevation
.
of obelisk and
36
pontoons.
38
XXII.—Obelisk crossing the Hudson River Railroad.
40
XXIII.—Route of the obelisk in New York.
42
XXIV.—Land transportation. Turning apparatus. Trestle in Central Park. "
44
c.—Iron channels and marine railway. ....
ix
46