Marion Heumuller, Mirjam Briel, Florian Klimscha, Andreas Kotula, Hanns Hubert Leuschner, Reinhold Schoon and Tanja Zerl
37
| | surface of trackway | | sand
O superstructure | | roots
O pegs O finds
□ crosswise supports g dendrodate
timber
Fig. 8 Detailed drawing of the construction. On the western edge of the trackway Pr 31 the longitudinal beams with anchoring pegs
above the trackway surface are still intact. The presence of further pegs and longitudinal beams suggests a similar construction on the
eastern edge (drawing: NLD).
37
| | surface of trackway | | sand
O superstructure | | roots
O pegs O finds
□ crosswise supports g dendrodate
timber
Fig. 8 Detailed drawing of the construction. On the western edge of the trackway Pr 31 the longitudinal beams with anchoring pegs
above the trackway surface are still intact. The presence of further pegs and longitudinal beams suggests a similar construction on the
eastern edge (drawing: NLD).