and the material (basalt slabs) has already been assembled at the
site.
The stores housing the finds from the excavations have been
relocated. New stores were arranged in adapted garages in the
former military area.
The problem of rebuilding the perimeter wall bordering the
site on the south (Fire Brigade) and east (Saphia Zaghloul street)
remains unresolved.
In view of planned performances to be held in the theatre,
both the design of the stairs at the southern end of the Theatre
Portico and the design of the new auditorium must be thoroughly
reconsidered and reassessed.
16
site.
The stores housing the finds from the excavations have been
relocated. New stores were arranged in adapted garages in the
former military area.
The problem of rebuilding the perimeter wall bordering the
site on the south (Fire Brigade) and east (Saphia Zaghloul street)
remains unresolved.
In view of planned performances to be held in the theatre,
both the design of the stairs at the southern end of the Theatre
Portico and the design of the new auditorium must be thoroughly
reconsidered and reassessed.
16